Significant structural deterioration and crumbling of the existing concrete slabs presented an immediate risk to site safety.

Project Overview

Significant structural deterioration and crumbling of the existing concrete slabs presented an immediate risk to site safety. Consequently, the client mandated the controlled dismantling and removal of these panels across the three-story facade. The project scope comprised the following key operational phases and services.

To establish secure access across all work zones, mobile scaffold towers were assembled and anchored directly to the building frame.

All personnel were outfitted with the requisite personal protective equipment mandatory for the operational scope.

Waste concrete panels were neatly palletized, loaded onto the R&D truck, and transported to an authorized disposal facility.

Method and Approach

To establish secure access across all work zones, mobile scaffold towers were assembled and anchored directly to the building frame.

Prior to starting dismantle operations, dual lifting slings were fastened to each concrete panel and attached to a safety line, after which the louvres were detached and stored for reinstallation.

The steel bracket fixings were unbolted to allow the original concrete panels to be removed and rotated to sever the spot welds, followed by controlled lowering to the designated ground staging site.

Waste concrete panels were subsequently loaded onto the R&D truck for offsite disposal.

Conclusion

A high standard of execution, quality control, and safety protocols was maintained across all phases of this demanding undertaking.

The site team executed the safe dismantling and offsite clearing of 309Lm of concrete panels.

Operations were concluded without any recordable safety occurrences or lost-time injuries